Sewage Water Treatment

Specifications

Sewage water treatment is the process of removing contaminants, pollutants, and harmful substances from domestic and municipal wastewater before its safe discharge into the environment or its reuse. Sewage water treatment is a critical part of modern sanitation and environmental protection efforts, as untreated sewage can pose significant health and environmental hazards. The sewage water treatment process involves several stages, each designed to target specific pollutants and achieve a higher level of water quality. It is used to purify municipal wastewater. It can also be used in agricultural and industrial wastewater treatment.

 

Product Details:

The first step involves screening to remove large objects such as sticks, rags, plastics, and other debris from the wastewater. Other stages include Primary Treatment, Secondary Treatment, Tertiary Treatment, Sludge Treatment, and Discharge or Reuse. Sewage Water Treatment is done with great efficacy by a Kolkata- based company called Ideas Engineering Works. We provide the best services for it across Asia and Gulf nations and our services are well appreciated in the industry. 

  • In water-scarce regions or for specific applications, treated sewage water may be reclaimed and reused for non-potable purposes
  • Continuous monitoring of various parameters, such as pH, dissolved oxygen, BOD, and pollutant concentrations, helps ensure the efficient operation of the treatment plant.
  • Sewage water treatment significantly reduces the environmental impact of sewage discharges, protecting water bodies and ecosystems from pollution.
Product/Service Name Sewage Water Treatment
Brand Name Ideas Engineering Works
Plant Type Sewage Treatment Plant (STP)
Application Industrial
Installation Service Yes available
Water Source Industrial Wastewater, Sewage Water
Treatment Types Physical, biological, chemical, and sludge water treatment
Capacity Inlet Flow Rate(m3/day) 500 to 1000 m3/day  (Depends on the project/clients requirement)
Materials Used Mild steel (MS), FRP, Stainless Steel
Treatment Method Used Mixed Bed Bio Reactor(MBBR), Sand Filtration, Activated Charcoal treatment (Adsorption), Ozonisation (Chemical Oxidation), Ultra Filtration (UF), Reverse Osmosis (RO) and evaporation (If required)
Power Source Electrical
Voltage Required 240 to 480V
Type Of Control In switch/panel or equivalent system
Installation Time/Period 5 to 15 Days (Depending on the project requirement)
Warranty On mechanical items
Servicing and Maintenance  Yes Available (As Per project requirement condition)
Transportation Charges Depends on project location and requirement
Payment Modes NEFT, RTGS, Cheque, IMPS, Bank Transfer (Only in Banking modes)
Installation Period/Time Depends on project requirement and location
Main Domestic Markets All over India
Country Origin India
Export Areas Nepal, Bangladesh and other neighbor countries

 

DISCOVER
Our Products
Order On Whatsapp